Setting up the Xerox C60/C70 D4A finisher can seem daunting, but with the right guidance, it becomes a straightforward process. This comprehensive guide walks you through every step of the installation, from connecting components to powering up the machine.
Step 1: Installing the Exit Tray and Booklet Maker
The installation begins with attaching two key components: the exit tray and the booklet maker tray.
Position the Components: Lift the tray brackets and align the exit tray in place. Ensure the black tabs click securely to lock it into position.
Secure the Connection: Push down firmly on the trays to clamp them in, ensuring stability during operation.
Step 2: Connecting Cables
Proper cable connections are critical for the finisher to operate seamlessly.
Ethernet Plug for Conveyor Belt Tray: Align the three connection holes on the Ethernet plug and insert it securely into the designated slot.
Back Panel Cables: Locate and retrieve hidden cords if necessary. Connect the black power cord and additional cables to their respective ports, ensuring a snug fit.
Step 3: Attaching the Finisher to the Copier
The finisher is designed to integrate smoothly with the copier.
Align and Attach: Open the copier’s front door and align the finisher with the designated ring. Push gently but firmly until the finisher clicks into place.
Connect to the Copier: Attach the required cable to integrate the finisher with the copier’s system.
Step 4: Securing the Screen and Scanner
The screen and scanner setup require precision to ensure proper alignment and functionality.
Connect the Cables: Attach the screen and scanner cables to their designated ports, ensuring they fit snugly.
Secure with Screws: Install screws to hold the screen and scanner firmly in place. Follow the video’s demonstration for exact screw placement.
Step 5: Setting Up the Fiery Interface
For advanced functionality, the fiery interface must be connected.
Connect the Crossover Cable: Plug the crossover cable into the fiery interface port labeled "copier" and then connect the Ethernet cord to the port labeled "LAN."
Secure Power and Connections: Ensure all cables, including power and video, are properly connected and secure.
Step 6: Powering On and Testing
With the setup complete, it’s time to power on the machine and test its functionality.
Prepare the Machine: Open the front door and flip the internal switch to the "on" position.
Power On: Press the power button and allow the machine approximately 10 minutes to communicate and initialize.
Test the System: Confirm that all components are functioning correctly and integrated seamlessly with the copier.
Comments